Palisade fencing installation

A contractor sets out the line, concretes a post at every 2.75 m, bolts on the rails as each post goes in, then bolts the pales along the rails. On a slope the bays are stepped. The fitting is priced on a site visit, and the steel is listed for delivery in 7 days to 4 weeks.

How a contractor puts a line up, step by step, what the site visit looks at and what goes on the quote.

Free and no obligation. Your request goes to one fencing contractor in your county, not a list.

  • 2.75 mbetween post centres
  • 5–10 minfor post-mix to set a post
  • 525 mmin the ground, 1.8 m fence
  • on a site visitthe fitting price
A long steel palisade fence along the edge of a grassy field, with trees behind

How palisade fencing is installed

  1. Set out the line. Corners, gate openings and every post position at the bay width are marked on the ground first.
  2. Dig and concrete the posts. Each post goes in a dug hole and is concreted, then checked for line and plumb before the concrete sets. Post-mix sets a post in 5 to 10 minutes.
  3. Rails as each post goes in. Bolting the rails to the last post before the next is concreted keeps every bay the same width.
  4. Pales along the rails. 17 to a bay, fixed with anti-tamper bolts and nuts.
  5. Gates. Gates hang on their own dig-in posts, concreted in line with the fence.

On a slope

Palisade follows a slope in steps. Each bay is set level and the line steps down from post to post as the ground falls. The height of each step and the gap under each bay are worked out at the set-out, before any post is concreted. The standard for palisade is written for level, normal ground, so a slope is something to see priced in writing.

Price your palisade fence

Three taps and the price of the steel shows as you go. Your name and number come last, and only if you want a contractor to price the job.

2.4 m steel palisade, 25 to 100 m, supplied and fitted: €2,175 to €12,000.

Step 1 of 5

How tall is the fence?

Pick the closest. The contractor asks the rest.

How the price is worked out

The figure is what Irish sellers charge for the pales, rails and posts of a palisade run, a metre with VAT, times the length you pick. It covers galvanised, green and black, so it is a range. Corner posts, gates, delivery and the fitting come on top, and the fitting is priced on a site visit. Fences of 3 m and over, and GRP, are priced to the site. Use it to plan with. It isn't a quote: a contractor prices yours after walking the line.

What the contractor looks at

  • The ground. Rock, soft ground and slopes change how the posts are set.
  • The line. Its length, its corners and where it ends.
  • The gates. Where they go, how wide, and which way they open.
  • Access. Room for a delivery of steel and for digging.
  • What is there now. An old fence to take out, and who takes it away.

Palisade fencing contractors

The planner on this page sends your answers to one fencing contractor who covers your county, who rings to arrange the site visit and prices the job in writing. Ask for the standard, the grade, the pale, the finish and the post count on the quote, so two prices compare like for like.

  • The height and the grade. 1.8, 2.0 or 2.4 m, general purpose or security purpose, and the standard named.
  • The pale. W or D section, its thickness in millimetres, and the head: triple point, single point or round.
  • The finish. Galvanised, or galvanised and powder coated, with the RAL number of the colour.
  • The length and the bays. Metres of fence, the number of 2.75 m bays, and every corner and end post.
  • The posts. Dug in and concreted, with the footing size, or bolted down where the ground calls for it.
  • The fixings. The anti-tamper bolts and nuts, named on the quote.

Delivery and dates

Suppliers list palisade parts for delivery in 7 days to 4 weeks, depending on the system, and stock gates in about 14 days. Ask the contractor for both dates on the quote.

Loads of steel over 85 kg are priced by phone, so the delivery belongs in the quote.

Questions before you order

How is palisade fencing installed?

A contractor sets out the line, concretes a post at every 2.75 m, bolts on the rails as each post goes in, then bolts the pales along the rails. On a slope the bays are stepped. The fitting is priced on a site visit, and the steel is listed for delivery in 7 days to 4 weeks.

How deep do palisade posts go?

Dig-in posts are longer than the fence, and the extra length is concreted into the ground: 2,325 mm posts carry a 1.8 m fence, 2,600 mm a 2.0 m fence and 3,125 mm a 2.4 m fence.

Can palisade go on sloping ground?

Yes. The bays are stepped, each one level, and the gap under each is worked out at the set-out.

How long does palisade take to arrive?

Suppliers list palisade parts for delivery in 7 days to 4 weeks, depending on the system, and stock gates in about 14 days. Ask the contractor for both dates on the quote.

How do I find a palisade fencing contractor?

Send your fence through the planner on this page. It goes to one fencing contractor who covers your county.

Everything on this site

A palisade fence running along the far side of a mown field, under a pale sky

See the price of the steel before anyone rings

Pick the height, the length and the job. When you want a firm price, it goes to a single fencing contractor in your county.